Chilled water piping design pdf

Water cooled condensers typically use an evaporative cooling tower. Common piping flow, at a temperature equal to secondary circuit return mixes with primary supply water to provide a mixed secondary supply temperature. The chilled water piping is currently configured in a very nontraditional layout. Variable volume chilled water pumping system controls. Chilled water design specifications unc facilities services. Pdf chilled water pipe design ghufran khan academia. A chilled water system is a cooling system in which chilled water is circulated throughout the building or through cooling coils in an hvac system in order to provide space cooling. Chiller plant design water conservation technology international. T of the chilled water chw returning to the campus plant is below the design value for which the chillers and pumps. They had corrosion problem with dissolved fe level as high as 100 ppm.

A twoinch schedule 40 pipe of chilled water can supply as much comfort cooling as 42 diameter round air duct. The system studied in this thesis is the chilled water system at the dallasfort worth international airport dfw airport. Be preferentially loaded, since it receives the warmest return water temperature. Pipe the heat recovery chiller in the sidestream position. Chilled water pump calculator engineering pro guides. After the water has been chilled, it is distributed via pumps, pipes, and.

Chilled water plant design guide december 2009 energydesignresources. Use material meeting the latest revision of the astm specifications as listed in this specification. In this article wel be covering chilled and condenser water schematics to learn how to read them, how to identify the main components and symbols as well as real world examples, additionally well cover the purpose of the main components and different design types. Design new chw systems with ariable v primary chilled water pumping with a controlled bypass to maintain minimum chilled water flow at the chiller evaporator. Piping shall be cut clean and square with the axis of the pipe using a saw, pipe cutting tool or machine deforming the pipe. The series will summarize ashraes self directed learning sdl course called fundamentals of design and control of central chilled water plants and the research that was performed to support its development. Fundamentals of design and control of central chilled water plants. The effect of leaving chilled water temperature change on power consumption can be 1. All cutting oils and foreign bodies shall be removed from joints prior to assembly where steel threaded joints are used. Friction loss using a fairly smooth pipe 200 100 80 60 50 40 30 20 10 8 6 5 3 2 0.

The piping may be tested in sections or in total, depending on site requirements and as per consultant advice. When the chwst is allowed to rise either from chiller reset or return water blending delta t decreases and both pump and fan energy rise to address the cooling load. Many designers tend to oversize pipework to allow for future capacity or low system resistance. The largest chiller is currently identified as ch2 and is the 750 ton trane chiller that was installed in about 2001. Oct 17, 2012 pipe 1 move bypass 2 increase pipe header sizes 3 buffer tank 120secs x flow rate e. Oct 02, 2017 ily chilled water and condenser water system piping system design, it is important to understand the evolution from 1 pipe into the other three systems, all of which are used for heating as well as cooling. Pdf carrier series new edition part 3 piping design. When the l eaving chilled water temper ature changes, the work a compressor must do also changes. For small rooms, the chilled water piping is usually routed through one large main supply and return pipe made of carbon steel or copper. From this point, read left and stop at the first pipe size selection line. Introduction in designing air conditioning and refrigeration plant, prediction of correct pressure drop is the most important factor. Ghufran khan four sources for the noise generation at velocities less than 3 ms, nearly no erosion. Like the primarysecondary system the single loop design has twoway valves in air.

Chilled water piping is insulated since the water and hence the piping is b elow the dewpoint temperature. The principal objectives of chilled water pumping system selection and design are to provide the required cooling capacity to each load, to promote the efficient use of. An expansion tank is required in the chilled water loop to allow for the thermal expansion of the water. Common design condition is supply water 44 f,return water. The insulation system recommendations in this guide are intended for use on cold or chilled water piping systems operating from 33f to 60f 0. The chilled water supply temperature must be cold enough to dehumidify the air, but not too cold that the chiller freezes. The energy efficiency ratio or eer is the ratio of the total cooling btuh to the total input. Improving chilled water piping distribution methodology. At design conditions these units must have a return temperature of at least 59. For chiller capacity when given chilled water pipe size, gpm or.

Use only long radius meeting the latest revision of the astm specifications as listed in this specification. The demise of the primarysecondary pumping paradigm for. Chilledwater system design decisions this engineers newsletter walks through a number of design decisions, with discussion and examples to explain how and why those decisions are made. Hvac rule of thumb calculator engineering pro guides. Piping connec tions at various equipment are covered, along with piping arrangements for chilled water systems. The most important characteristic of system design where secondary circuit flow rate is greater than primary is the mix occurring at tee a. Using chilled water to cool a building or process is efficient and flexible. See sidebar, page 34, for a summary of the topics to be discussed. Chilledwater system design issues learning from past. The chilled water pump is used to circulate chilled water in a. For chiller capacity when given condenser water pipe size, gpm or. Chiller compressor may be centrifugal, scroll, screw or reciprocating 3.

Chilled water plant design guide pdf mechanical engineers who design chilled water plants are the target audience for the guide. At the lowest building load and highest distribution system differential pressure, the valve must be at no less than 1% of its full range travel. The bypass line sized the same as the supply manifold and valve that allow minimum chiller flow rate are located in. High velocity erosion occur rapidly specially in bends. The series will summarize ashraes selfdirected learning sdl course called. Design evaporator pressure drop increases since water must flow through. Improving chilled water piping distribution methodology for. Oct 19, 2017 the water cooled condenser is typically part of a water cooled chiller or water cooled package unit a cooling tower rejects the condenser heat to the atmosphere flow rates and temperatures are industry standards for north america piping and pumps circulate water water is reused and exposed to the ambient conditions.

Chilled water pipe protection a large pharmaceutical company has 2. The intent of these standards are to provide input to the design team on the universitys preference of manufacturers, design, equipment options and quality assurance to. Chiller application guide daikin ag 31003 daikin applied. Operate as a heater to make the desired leaving condenser water temperature.

Keyword chilled water piping, 2k, 3k, pressure drop, ishare, cfd analysis i. While designing a chilledwater system, a myriad of decisions must be made. The method for routing chilled water piping depends on the size of the room and the number of air conditioners. Piping shall exit curb near the top and through the side of the curb. Before installation all ends of the pipework shall be made square and smooth. This system has the problem of low deltat under low cooling loads. The maximum allowable elevation of chilled water piping in the building is 565.

Prediction of pressure drop in chilled water piping system. Figure 48 primarysecondary variable flow piping, multiple parallel chillers. To balance the width of the pipe rack of different tiers, water, air, nitrogen such lines can be kept on any of the tiers, there is no restriction to such utility lines. They installed the baccomber ulf system on the common header. Variable primary chilled water pumping system with bypass valve single chiller, single variable speed pump. The maximum allowable elevation of chilled water piping in the building is 565 feet above sea level and not less than 350 feet above sea level.

The building system includes all chilled water piping in the building. If youve designed a large distributed chilled water system and monitored the operation of the central plant, you already know about the problems. Recommendations for selecting design chilled water temperatures 6 10. Chilled water piping is insulated since the water and hence the piping is below the dewpoint temperature. Restrained type joint fittings shall be equal to ebba iron series 1100 megalug restraint systems for mechanical joint ductile iron piping, fittings. The number of operating pumps need not match the number of operating chillers. Condenserwater pumps, pipes, and cooling towers or. This guide covers the design and selection of a chilled water pump. Modeling and analysis of chilled water systems dtic. Selecting chilled water distribution system flow arrangement.

When the chilled water flow is much lower than the design conditions at low cooling loads, it may lead to the laminar flow of the chilled water in. Variable primary flow at design variable primary flow at 100% system load twoway valves control capacity by varying flow of water in coils per chiller system load 500 tons 1760kw 1500 tons 5280kw primary bypass flow 3000gpm 189 ls 0gpm 0 ls delta t 12 of 6. For example, a water piping system having 1 km length pumping water from a river bed pumping station to a plant will have different set of rules compared to a water piping system having 5 meter length for supplying water from a main header to a reactor. Appropriate and economical selection of pump requires accurate prediction of pressure drop in chilled. For larger rooms, several large manifolds of carbon steel pipe. Terminal units fan coils, chilled beams, finned tube, radiant, etc. Chilled water systems back to basics jonathan ramajoo. This change in heat rejection from air to water greatly improves the efficiency because the heat transfer is much better with water due to its increased heat capacity. Quick reference for efficient chiller system design.

Condensate would form on it and heat loss would occur. Chilled water distribution unc facilities services. The sidestream configuration figure 5 allows the heat recovery chiller to. Pipe shall conform to awwa c900 awwa c905 dr 18, castiron o. Locate the point at which these two values intersect. The typical chilled water temperatures are shown below.

Chilled water plant design guide energydesignresources taylor. As a result, a new chilled water system design has become available. Pipe rack design and calculations make piping easy. Designer must calculate chilled water static plus dynamic head for each project and determine if pressure limits. For larger rooms, several large manifolds of carbon steel pipe are used. The chilled water pump is used to circulate chilled water in a closed system. Trane 2009 water piping capacity tons brochure concept inspired by. The range of allowable elevation of chilled water piping in the building is a maximum of 565 feet above sea level and a minimum of 350 feet above sea level. The chilled water piping shall be tested according to the system working pressure i. Recently, new chiller controls have been implemented that allow variable chilled water flow rate in chillers.

The system consists of a chiller, cooling tower, building cooling load, chilled water and condensing water pumps and piping. Water differential pressure transmitter near the end of the piping run. Hot water piping 3 inches and larger, and chilled water lines with straight runs longer than 150 feet should be supported on roller hangers. Apr 18, 2018 chilled water schematic and condenser water schematics. P across chiller vessel smaller pump heads smaller pumps energy savings conventional chw ent. Design generation equipment boilers, chillers, cooling towers, wwhps, etc. Chilled water piping distribution systems ashrae 3. Hvac selection based on frictional loss of 4 ft of water 100 ft pipe dia. Primary flow must always be equal to or greater than secondary flow. Experienced engineers often make these decisions automatically as they have in the. For insulated pipe 8 inches and larger and uninsulated pipe 12 inches and larger, provide individual trapeze hangers. This is known 22 hpac engineering november 2011 energy impacts of chilled water piping configuration 3,000 gpm at 56f vsd vsd vsd figure 2 26p8 wide condenser evaporator primary pumps, 1,000 gpm each 500 tons each. Chilled water design specifications facilities services.

Closedloop hydronic system piping is generally sized below certain arbitrary upper limits, such as a velocity limit of 1 1turbulencethe noise generated by. Designer must calculate chilled water static plus dynamic head for each project and determine if pressure limits of the chilled water system are exceeded. High chilled water supply temperature chwst increases both pump and fan energy. Normally a magnetic type flow meter shall be provided to measure primary flow for minimum flow control. This system separates the generation zone chillerevaporator of a. Insulation inserts shall be installed at hangers for glass fiber insulated piping 3 and larger and as an option to reduce shield length on pipes below 3. Water differential pressure transmitter near the end of the piping. Fill each pipe covering protection saddle with same insulation as specified for respective pipe or with suitable insulating cement. This design is a single loop system with a single set of pumps. Selection of condenser water design temperatures and cooling tower 611. Chilledwater distribution pumps and pipes that send chilled water to the loads.

See sidebar, page 36 for a summary of the topics to be discussed. Chilled water piping distribution systems ashrae 31214. This standard includes hydronic piping requirements for both chilled water and heating hot water at buildings either served by district heating or standalone. The use of chillers allows the design engineer to produce chilled water in a central building location or even on. Pipe sizes for water distribution system design d7 step 4. In systems that are able to maintain high temperature differences. Fix the sleeves as per approved shop drawings and specification, during the construction of structural elements. Chilled water piping construction checklist page 1 of 4 version 1205 chilled water piping construction checklist project.